What does quoting by hand cost you?
100 requests a month at 30 minutes each is 50 hours of quoting, about 6 working days, or €2,000 at €40 an hour. At a 20 % win rate every order won carries €100 of quoting, and the 80 quotes that don't win took 40 hours.
Hours and cost a month
| Quote requests a month | 10 min | 20 min | 30 min | 60 min |
|---|---|---|---|---|
| 20 | 3 h €133 | 7 h €267 | 10 h €400 | 20 h €800 |
| 50 | 8 h €333 | 17 h €667 | 25 h €1,000 | 50 h €2,000 |
| 100 | 17 h €667 | 33 h €1,333 | 50 h €2,000 | 100 h €4,000 |
| 200 | 33 h €1,333 | 67 h €2,667 | 100 h €4,000 | 200 h €8,000 |
| 400 | 67 h €2,667 | 133 h €5,333 | 200 h €8,000 | 400 h €16,000 |
At €40 an hour.
How it's calculated
A quote for a sheet metal part takes longer than it looks: open the drawing, check the material and thickness, unfold the bent part or measure the flat, estimate the cut length and pierces, look up the sheet price, count the bends, work out the price, write the email. Twenty to sixty minutes is common for a part; an assembly takes hours.
hours a month = requests × minutes per quote ÷ 60cost a month = hours × the cost of an office hourquoting cost per order won = cost ÷ (requests × win rate)
The last line is the one to look at. Most requests don't become orders: customers ask several shops at once, and a 15 to 30 % win rate is normal for job shops. Every order you win pays for the quotes you lost too. With 100 requests at 30 minutes and a 20 % win rate, that's €100 of office time inside every order before a sheet is cut.
There's a second cost the formula doesn't show: time to answer. A customer who sends a drawing to three shops often orders from the first one with a reasonable price. A quote that takes two days to come back may be priced right and still be too late.
What changes with online quoting: the customer uploads the STEP or DXF and gets the price at once, calculated from your machines, sheets and rates, any time of day. Your time goes into checking the orders that come in and the parts the system sends to you for review, a few minutes instead of half an hour. In the example that's 5 hours a month instead of 50, and €1,800 of office time.
This calculator counts office time only. The other side, winning more because you answer first, depends on your market and isn't in the numbers.
Worked example
A shop gets 100 quote requests a month and spends 30 minutes on each; its office hour costs €40; it wins one quote in five:
- 50 hours a month of quoting, €2,000
- 20 orders won: €100 of quoting in each
- With instant quotes and 3 minutes to check each: 5 hours, €200
Do this for every part automatically
CadQuoter reads your customers' STEP, DXF and DWG files and prices laser cutting, bending, welding and tube cutting with your machines, sheets and rates, in seconds. Customers order and pay online; you get the order with the flat patterns.
The demo needs no account. 200 PLN / €50 + VAT per month, no commission.
Frequently asked questions
How long should a sheet metal quote take?
For a simple flat part 10 to 20 minutes by hand, for a bent part with holes 30 minutes or more, for welded assemblies hours. Online quoting from the CAD file takes seconds.
What is a normal win rate for quotes?
For job shops 15 to 30 % is common, higher with regular customers and lower on open marketplaces. The lower it is, the more each won order pays for quoting.
Is quoting overhead or a cost of each order?
It's overhead that only orders can pay for. Counting it per order won shows what it really costs.
How does CadQuoter cut quoting time?
Customers upload STEP, DXF or DWG files and get a price from your own machines, sheets and rates in seconds; parts that need a look come to you as quote requests with the analysis done.
Last checked: 13 Nov 2026